Installation and Commissioning
Pre-fabricated assemblies produced in our manufacturing facilities are installed by crews familiar with how the systems were designed and built. This continuity reduces field rework, supports schedule certainty, and ensures systems are commissioned as intended.


Dedicated Installation Teams
Installation is led by Innovative project managers and executed by our experienced foremen and field crews who specialize in industrial refrigeration work. While supplemental labor may be used when required, the majority of installation and commissioning activities are performed by Innovative personnel.
Field teams include:
Certified welders and pipefitters
Industrial electricians
Refrigeration technicians
Pipe insulation specialists
IMP panel installers
These teams support projects across a broad geographic footprint, including new construction, system expansions, and retrofit work in operating facilities.
Complete Installation Scope
Installation teams perform the full physical build of the refrigeration system, including:
Rigging and setting major equipment
Refrigeration piping and welding
Mechanical enclosure and penthouse installation
Electrical power and control wiring
Control cabinet and panel installation
Pipe insulation and thermal protection
IMP panel installation and coordination
Integration with building utilities and infrastructure
Executing this scope under a single organization keeps installation aligned with engineering intent and commissioning requirements.


Commissioning, Startup, and System Handoff
Commissioning begins during installation and continues through startup, system validation, and operational handoff. Commissioning engineers and controls engineers are onsite to verify system performance under real operating conditions and confirm the system is ready for sustained operation.
Commissioning activities include:
Safety startup inspections and documentation
Verification of piping, instrumentation, and electrical systems
System evacuation, moisture removal, and refrigerant charging to prepare the system for stable operation
Emergency system and safety device checks
Functional testing of valves, sensors, and control devices
PLC and HMI programming validation
Verification of sequences of operation
System capacity, flow, and performance testing
Controls engineers test and validate system control logic and automation sequences developed in-house to confirm proper operation under real operating conditions.
Commissioning concludes with system training, documentation review, and operator handoff, ensuring facility teams are prepared to operate and maintain the system safely from day one.